LK&O

A Railroad with Relevance

Module #5 Complete

Written By: Alan - Nov• 08•15

With missing ties installed and a coat of module 5camo brown Module 5 is finished and back on the layout. Hoisting this very long module into place without damaging anything on the underside was quite a challenge. It was heavy, awkward, long, and generally just a PIA. But thanks to help from my wife it is in place with no harm done. Connector #4 is on the bench ready to be built.

100_7649

100_7664

Share

You can follow any responses to this entry through the RSS 2.0 feed. You can skip to the end and leave a response. Pinging is currently not allowed.

3 Comments

  1. Will Knapek says:

    Another milestone. Can’t wait to see trains run.

  2. Lee Lovelette says:

    Hey Alan, any chance of coming over to see the empire and chit-chat some??

  3. alan says:

    Sure! I’ll contact you.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.