Nothing like changing horses in the middle of the stream, right? As was expected, there were numerous changes required in the existing setup to accommodate the new lower deck design. These included: I’m currently working on the lights but 1, 2, and 3 are done. Hidden track right-of-way The hidden track (10 Mile Tunnel) that […]
Read the rest of this entry »